District of Columbia
Who may prepare a stormwater plan in District of Columbia
We found no state level preparer credential for District of Columbia. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
The answer
None foundWe found no state level preparer credential for District of Columbia. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
EPA is the permitting authority. Coverage is under EPA's 2022 CGP, permit area DCR100000. CGP Part 9.3.1 requires compliance with the District's Stormwater Management and Soil Erosion and Sediment Control regulations in Chapter 5 of Title 21 DCMR, and requires a copy of the SWPPP to be submitted to DOEE during review and approval of the DOEE Erosion and Sediment Control Plan. Authorization must also be requested from DOEE to discharge dewatering water or groundwater to the District MS4 or a surface water body. IMPORTANT: whether the separate DOEE Erosion and Sediment Control Plan requires a credentialed preparer was NOT verified, so the credential flag here is scoped to the federal SWPPP only. The 2022 CGP as modified became effective April 8, 2025 and expires February 16, 2027; confirm the successor permit near that date. Credential: the 2022 CGP imposes no SWPPP preparer credential. It does require inspections by a 'qualified person' (Part 4.1), which is an inspection credential, not a preparation credential.
No permit section cited. Confirm this with your permitting authority.
What this means for a generated plan
On what we verified, an operator may adopt a generated plan here without a credentialed signature. Local ordinances can still impose a stricter gate than state law, so check the county or municipality as well.
Screen a District of Columbia site, credential answer included
What people ask about preparing a SWPPP in District of Columbia
Do I need a qualified preparer for a SWPPP in District of Columbia?
We found no state level preparer credential for District of Columbia. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
Does a professional engineer have to stamp the plan in District of Columbia?
Practice act citations are routinely overstated on this point. A PE stamp is not required as a general matter in most states with no preparer gate, and where we have not verified it we will not assert either answer. Confirm with the state board or the permitting authority.
Get the answer before somebody starts drafting
Screening is free and runs in your browser. Pro generates the plan document and keeps the record the permit requires.