SWPPP requirements
SWPPP requirements, state by state, with the permit section behind each one
Inspection frequency, stabilisation deadlines, corrective action windows, buffers, record retention and the filing path. Pick your state, then run your actual acreage and receiving water facts through the screening embedded on the page.
How to read a state page
Where EPA is the permitting authority the page carries the real requirements, cited to the section of the 2022 Construction General Permit they came from. Where a state issues its own permit and we have not read it, the page says so and links the agency. It does not quietly show you the federal numbers instead, because those are not the numbers that would be enforced against you.
The preparer credential answer is on every page either way, and that one we have verified for a large part of the country. See the methodology page for exactly what is and is not covered.
All jurisdictions
Choose your state
A badge marks whether the governing permit is one we have read in full.
- AlabamaVerified
- AlaskaVerified
- ArizonaNot verified
- ArkansasVerified
- CaliforniaVerified
- ColoradoVerified
- ConnecticutVerified
- DelawareVerified
- District of ColumbiaFederal permit
- FloridaVerified
- GeorgiaVerified
- HawaiiVerified
- IdahoNot verified
- IllinoisVerified
- IndianaVerified
- IowaVerified
- KansasNot verified
- KentuckyVerified
- LouisianaVerified
- MaineVerified
- MarylandNot verified
- MassachusettsFederal permit
- MichiganNot verified
- MinnesotaVerified
- MississippiVerified
- MissouriNot verified
- MontanaVerified
- NebraskaVerified
- NevadaVerified
- New HampshireFederal permit
- New JerseyNot verified
- New MexicoFederal permit
- New YorkVerified
- North CarolinaVerified
- North DakotaVerified
- OhioVerified
- OklahomaVerified
- OregonVerified
- PennsylvaniaVerified
- Puerto RicoFederal permit
- Rhode IslandNot verified
- South CarolinaNot verified
- South DakotaVerified
- TennesseeNot verified
- TexasVerified
- UtahNot verified
- VermontVerified
- VirginiaVerified
- WashingtonVerified
- West VirginiaNot verified
- WisconsinVerified
- WyomingNot verified
FAQ
What people ask about SWPPP requirements
What is a SWPPP?
A stormwater pollution prevention plan is the written, site specific document a covered construction operator must develop before filing a Notice of Intent and must keep on or near the site. It records the site, the discharges, the controls you will install, who inspects and how often, and what you did when something failed. It is a condition of permit coverage, not paperwork alongside it: an operator with coverage and no plan is out of compliance.
Are SWPPP requirements the same in every state?
No. EPA's 2022 Construction General Permit governs where a state is not NPDES authorised. Most states run their own programme and issue their own construction general permit, which must be at least as protective but can be stricter, and can set different inspection frequencies, stabilisation deadlines and filing paths. That is why these pages are per state, and why a state permit we have not read renders as not verified rather than borrowing the federal answer.
How often do I have to inspect under the federal permit?
Either once every seven calendar days, or once every 14 calendar days plus within 24 hours of a storm producing 0.25 inches or more of rain. Discharging to a sediment or nutrient impaired water, or a Tier 2, 2.5 or 3 water, forces the increased frequency: every seven days and within 24 hours of a qualifying storm. Arid, semi arid and drought stricken sites may qualify for a reduction during the seasonally dry period.
Is a SWPPP template enough?
A template is a starting shape, not a plan. The permit requires the document to be site specific: your discharge points, your soils and slopes, the controls you actually installed, your inspection schedule and your corrective action record. A generic template filled in loosely is the most common finding at an inspection. What the tool here does is tell you which requirements attach to your particular site, with the permit section behind each, so a document is built from the site rather than from a form.