Michigan
Who may prepare a stormwater plan in Michigan
We found no state level preparer credential for Michigan. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
The answer
None foundWe found no state level preparer credential for Michigan. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
MCL 324.9123 certifies agency staff administering the program, not applicants.
No permit section cited. Confirm this with your permitting authority.
What this means for a generated plan
On what we verified, an operator may adopt a generated plan here without a credentialed signature. Local ordinances can still impose a stricter gate than state law, so check the county or municipality as well.
Screen a Michigan site, credential answer included
What people ask about preparing a SWPPP in Michigan
Do I need a qualified preparer for a SWPPP in Michigan?
We found no state level preparer credential for Michigan. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
Does a professional engineer have to stamp the plan in Michigan?
Practice act citations are routinely overstated on this point. A PE stamp is not required as a general matter in most states with no preparer gate, and where we have not verified it we will not assert either answer. Confirm with the state board or the permitting authority.
Get the answer before somebody starts drafting
Screening is free and runs in your browser. Pro generates the plan document and keeps the record the permit requires.