New York

Who may prepare a stormwater plan in New York

New York requires a credentialed preparer only in some cases. Plan scope rather than acreage: Only where the plan includes the Stormwater Management Practice component.

The answer

Conditional

New York requires a credentialed preparer only in some cases. Plan scope rather than acreage: Only where the plan includes the Stormwater Management Practice component.

What triggers it: Plan scope rather than acreage: Only where the plan includes the Stormwater Management Practice component.

Credentials that qualify

  • Licensed PE
  • Registered landscape architect
  • Qualified Professional (licensed Professional Engineer, Registered Landscape Architect or other NYSDEC endorsed individual); a New York licensed PE is required for components involving the practice of engineering

New York gates only when the stormwater management practice component is required. An erosion-control-only plan is not gated. An erosion-and-sediment-control-only plan has NO preparer credential requirement. The 4-hour NYSDEC training qualifies a person only under the direct supervision of a licensed PE or RLA. Reconciled against the jurisdiction registry, which found a preparer requirement this entry had missed. Where the two sources disagreed we kept the stricter answer.

VerifiedGP-0-25-001 Part III.A.4Source

What this means for a generated plan

Where a credential applies, or where we cannot confirm that none does, treat a generated document as a complete draft for a credentialed preparer to review, amend and sign. It is not by itself a compliant filed plan, and ours says so on its face.

Screen a New York site, credential answer included

Screen your site

Runs in your browser

Total land disturbance over the whole project, including staging and access. This decides whether you need a permit at all.

Optional. If you phase the work, the most that will be disturbed at once. Leave blank if the whole site is open together. The stabilisation deadline turns on this figure, not the total.

A half acre lot inside a 40 acre subdivision is covered even though the lot alone is under the threshold. This is the most commonly missed trigger in the permit.

Receiving water and site conditions(optional, but they change the inspection frequency)

May allow a reduced inspection frequency during the seasonally dry period.

EPA keeps permitting authority in Indian country even inside a state that runs its own programme.

No account, no card, nothing transmitted.

What people ask about preparing a SWPPP in New York

Do I need a qualified preparer for a SWPPP in New York?

New York requires a credentialed preparer only in some cases. Plan scope rather than acreage: Only where the plan includes the Stormwater Management Practice component.

Does a professional engineer have to stamp the plan in New York?

Practice act citations are routinely overstated on this point. A PE stamp is not required as a general matter in most states with no preparer gate, and where we have not verified it we will not assert either answer. Confirm with the state board or the permitting authority.