Skip to content

South Carolina

Who may prepare a stormwater plan in South Carolina

South Carolina requires a credentialed preparer. A plan generated here is a draft for that person to review, adopt and sign.

The answer

Credential required

South Carolina requires a credentialed preparer. A plan generated here is a draft for that person to review, adopt and sign.

Credentials that qualify

  • PE seal
  • Registered landscape architect seal
  • Tier B surveyor seal

South Carolina expressly does NOT accept CPESC as a signer. A CPESC may assist but cannot seal. Sites of 2 acres or less are exempt.

VerifiedS.C. Reg. 72-305.H and .JSource

What this means for a generated plan

Where a credential applies, or where we cannot confirm that none does, treat a generated document as a complete draft for a credentialed preparer to review, amend and sign. It is not by itself a compliant filed plan, and ours says so on its face.

Screen a South Carolina site, credential answer included

Screen your site

Runs in your browser

Total land disturbance over the whole project, including staging and access. This decides whether you need a permit at all.

Optional. If you phase the work, the most that will be disturbed at once. Leave blank if the whole site is open together. The stabilisation deadline turns on this figure, not the total.

A half acre lot inside a 40 acre subdivision is covered even though the lot alone is under the threshold. This is the most commonly missed trigger in the permit.

Receiving water and site conditions(optional, but they change the inspection frequency)

May allow a reduced inspection frequency during the seasonally dry period.

EPA keeps permitting authority in Indian country even inside a state that runs its own programme.

No account, no card, nothing transmitted.

What people ask about preparing a SWPPP in South Carolina

Do I need a qualified preparer for a SWPPP in South Carolina?

South Carolina requires a credentialed preparer. A plan generated here is a draft for that person to review, adopt and sign.

Does a professional engineer have to stamp the plan in South Carolina?

Practice act citations are routinely overstated on this point. A PE stamp is not required as a general matter in most states with no preparer gate, and where we have not verified it we will not assert either answer. Confirm with the state board or the permitting authority.

Get the answer before somebody starts drafting

Screening is free and runs in your browser. Pro generates the plan document and keeps the record the permit requires.