South Dakota
Who may prepare a stormwater plan in South Dakota
We found no state level preparer credential for South Dakota. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
The answer
None foundWe found no state level preparer credential for South Dakota. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
Effective November 1, 2023, expires October 31, 2028. Credential: the permit contains no preparer credential. Its qualification language is the standard signatory boilerplate about the information-gathering system, and Section 7.4 requires signature by a principal executive officer or ranking elected official, which is signatory authority rather than a credential.
No permit section cited. Confirm this with your permitting authority.
What this means for a generated plan
On what we verified, an operator may adopt a generated plan here without a credentialed signature. Local ordinances can still impose a stricter gate than state law, so check the county or municipality as well.
Screen a South Dakota site, credential answer included
What people ask about preparing a SWPPP in South Dakota
Do I need a qualified preparer for a SWPPP in South Dakota?
We found no state level preparer credential for South Dakota. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.
Does a professional engineer have to stamp the plan in South Dakota?
Practice act citations are routinely overstated on this point. A PE stamp is not required as a general matter in most states with no preparer gate, and where we have not verified it we will not assert either answer. Confirm with the state board or the permitting authority.
Get the answer before somebody starts drafting
Screening is free and runs in your browser. Pro generates the plan document and keeps the record the permit requires.