Who may prepare a stormwater plan in Virginia

Virginia requires a credentialed preparer only in some cases. Plan scope rather than acreage: The SWM plan is gated; the erosion and sediment control plan is not.

The answer

Conditional

Virginia requires a credentialed preparer only in some cases. Plan scope rather than acreage: The SWM plan is gated; the erosion and sediment control plan is not.

What triggers it: Plan scope rather than acreage: The SWM plan is gated; the erosion and sediment control plan is not.

Credentials that qualify

  • Licensed professional seal on the stormwater management plan

The Responsible Land Disturber role is on-site execution, not plan preparation.

Verified9VAC25-875-510(C); 9VAC25-875-550 has no counterpartSource

What this means for a generated plan

Where a credential applies, or where we cannot confirm that none does, treat a generated document as a complete draft for a credentialed preparer to review, amend and sign. It is not by itself a compliant filed plan, and ours says so on its face.

Screen a Virginia site, credential answer included

Screen your site

Runs in your browser

Total land disturbance over the whole project, including staging and access. This decides whether you need a permit at all.

Optional. If you phase the work, the most that will be disturbed at once. Leave blank if the whole site is open together. The stabilisation deadline turns on this figure, not the total.

A half acre lot inside a 40 acre subdivision is covered even though the lot alone is under the threshold. This is the most commonly missed trigger in the permit.

Receiving water and site conditions(optional, but they change the inspection frequency)

May allow a reduced inspection frequency during the seasonally dry period.

EPA keeps permitting authority in Indian country even inside a state that runs its own programme.

No account, no card, nothing transmitted.

What people ask about preparing a SWPPP in Virginia

Do I need a qualified preparer for a SWPPP in Virginia?

Virginia requires a credentialed preparer only in some cases. Plan scope rather than acreage: The SWM plan is gated; the erosion and sediment control plan is not.

Does a professional engineer have to stamp the plan in Virginia?

Practice act citations are routinely overstated on this point. A PE stamp is not required as a general matter in most states with no preparer gate, and where we have not verified it we will not assert either answer. Confirm with the state board or the permitting authority.

Get the answer before somebody starts drafting