Who may prepare a stormwater plan in Washington

We found no state level preparer credential for Washington. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.

The answer

None found

We found no state level preparer credential for Washington. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.

CSWGP Section 9 contains no professional-engineer or licensure requirement. CESCL is inspection-scoped under S4.B.

No permit section cited. Confirm this with your permitting authority.

What this means for a generated plan

On what we verified, an operator may adopt a generated plan here without a credentialed signature. Local ordinances can still impose a stricter gate than state law, so check the county or municipality as well.

Screen a Washington site, credential answer included

Screen your site

Runs in your browser

Total land disturbance over the whole project, including staging and access. This decides whether you need a permit at all.

Optional. If you phase the work, the most that will be disturbed at once. Leave blank if the whole site is open together. The stabilisation deadline turns on this figure, not the total.

A half acre lot inside a 40 acre subdivision is covered even though the lot alone is under the threshold. This is the most commonly missed trigger in the permit.

Receiving water and site conditions(optional, but they change the inspection frequency)

May allow a reduced inspection frequency during the seasonally dry period.

EPA keeps permitting authority in Indian country even inside a state that runs its own programme.

No account, no card, nothing transmitted.

What people ask about preparing a SWPPP in Washington

Do I need a qualified preparer for a SWPPP in Washington?

We found no state level preparer credential for Washington. On what we verified, an operator may adopt the plan without a credentialed signature. Local ordinances can still be stricter.

Does a professional engineer have to stamp the plan in Washington?

Practice act citations are routinely overstated on this point. A PE stamp is not required as a general matter in most states with no preparer gate, and where we have not verified it we will not assert either answer. Confirm with the state board or the permitting authority.

Get the answer before somebody starts drafting

Screening is free and runs in your browser. Pro generates the plan document and keeps the record the permit requires.