The stormwater permit for construction in Utah

Utah runs its own NPDES programme, so a state issued construction general permit governs. Below is what our engine can say about it, and where we have not read that permit, what it will not say.

Governing permit

Not verified for Utah

We have not read the construction general permit that governs this jurisdiction, so we will not name one. Confirm which permit applies with Utah Department of Environmental Quality (Utah DEQ), Division of Water Quality before you break ground.

Who may prepare the plan

Conditional, depends on the site

Utah gates plan preparation only above a threshold this site does not meet. The gate applies above 5 acres. This site is 1 acres. On what we have verified, a generated plan can be adopted without a credentialed signature.

Qualifying routes

  • RSW
  • PE or PG
  • CPESC
  • CPSWQ
  • NICET III
VerifiedUTRC00000 Part 7.2Source

Does a site in Utah need coverage

Worked for a one acre site as a reference point. Change the acreage in the tool below and the answer, and its reasoning, change with it.

Coverage

Permit coverage required

Not verified

The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

Determined against dataset version 2026-07-19.

Read these before you act on the answer

  • We could not verify which permit governs a construction site in Utah. Confirm with the state permitting authority before you break ground.
  • Utah gates plan preparation only above a threshold this site does not meet. The gate applies above 5 acres. This site is 1 acres. On what we have verified, a generated plan can be adopted without a credentialed signature.
  • Basinwise does not perform the physical site inspections the permit requires. Those must be carried out on site by a qualified person.
How this answer was reached, step by step
  1. 1

    Coverage threshold

    The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

    VerifiedPart 1.1.2Source
  2. 2

    Permitting authority

    Utah runs its own NPDES programme, and we have not verified its construction general permit. We will not guess its requirements.

  3. 3

    Preparer credential

    Utah gates plan preparation only above a threshold this site does not meet. The gate applies above 5 acres. This site is 1 acres. On what we have verified, a generated plan can be adopted without a credentialed signature.

    VerifiedUTRC00000 Part 7.2Source

What to do next

  1. 1. Confirm the governing permit. We have not verified this. Contact Utah Department of Environmental Quality (Utah DEQ), Division of Water Quality and ask which construction general permit covers your site. Utah Department of Environmental Quality (Utah DEQ), Division of Water Quality
  2. 2. Settle the preparer question before you draft. Getting this wrong costs a redraft at best. The detail is on the credential page for this state. Preparer credential in Utah
  3. 3. Screen the site. Run the real acreage and receiving water facts through the tool below. You get the inspection frequency, the stabilisation deadlines and the filing path with the permit section behind each.
  4. 4. Read the requirements in full. SWPPP requirements in Utah

Screen a Utah site now

Runs in your browser. Nothing about the site is transmitted.

Screen your site

Runs in your browser

Total land disturbance over the whole project, including staging and access. This decides whether you need a permit at all.

Optional. If you phase the work, the most that will be disturbed at once. Leave blank if the whole site is open together. The stabilisation deadline turns on this figure, not the total.

A half acre lot inside a 40 acre subdivision is covered even though the lot alone is under the threshold. This is the most commonly missed trigger in the permit.

Receiving water and site conditions(optional, but they change the inspection frequency)

May allow a reduced inspection frequency during the seasonally dry period.

EPA keeps permitting authority in Indian country even inside a state that runs its own programme.

No account, no card, nothing transmitted.

What people ask about the Utah construction stormwater permit

Do I need a stormwater permit for a construction site in Utah?

Permit coverage is triggered at one acre of land disturbance, and below one acre if the project is part of a larger common plan of development or sale that will ultimately disturb an acre or more. The project disturbs 1 acres, at or above the 1 acre threshold, so it needs permit coverage.

Who issues the construction stormwater permit in Utah?

We have not verified which permit governs construction stormwater in Utah. Confirm with Utah Department of Environmental Quality (Utah DEQ), Division of Water Quality before you break ground. We will not name a permit we have not read.

Does Utah require a qualified preparer for the plan?

Utah gates plan preparation only above a threshold this site does not meet. The gate applies above 5 acres. This site is 1 acres. On what we have verified, a generated plan can be adopted without a credentialed signature.

Keep the record Utah will ask you for

The screening is free. Holding the written plan and the retained inspection log is what the permit actually demands.